After almost waiting a full year I have finally figured out a track plan for my Hon3 layout. I started building the bench work yesterday. It is a three piece modular layout. Photos to come soon!
Here are the photos from the work I did Saturday nite and the track plan. Track is to be all micro-engineering code 70. Let me know what you guys think. Thanks!
Benchwork looks plenty solid. Your track plan has a lot of nice sweeping curves. Should provide for a good number of interesting photos! Just curious- Will your RR be freelance? Or follow a prototype?
It will be freelance but the equipment is all Rio Grande stuff. So far Blackstone C-19 and K-27, MMI K-27, and a goose. All with sound:tb-biggrin:.
Work on the layout is going to continue today. Hope to finish up the bench work and have the yard installed today. Just bought all my turnouts today. Pics to come!
Yes there will be some industry. First I want to get the mainline in and in good running shape, then where there is enough room I will fit some industries. Probably two or three.
Here is the progress so far. All the roadbed and bench work is done and half of the track is laid. There is a building I built today and weathered.