Holy schnikes, I think this is going to work! [IMG] Sent from my iPhone using Tapatalk
Thank you! Believe me, there have been times where I did regret how I twisted myself to get the benchwork up with one hand and a cordless drill...
“If you don’t know where you are going, you’ll end up someplace else.” – Yogi Berra I spent far less time planning the upper level than the lower...
FOR SALE: Scale Trains “Rivet Counter” PS 5820 covered hoppers. All slightly used in perfect condition with original boxes. $40 each / $150 for...
Athearn “Blue Box”, with Kadee couplers and no steps broken off…. Probably $10 each. Some things a little less, some a little more. I personally...
Last Summer, United Coal / Carter-Roag announced the impending closure of their Morgan Camp mine and Star Bridge prep plant in Randolph County,...
LMAO![emoji1787] Sent from my iPhone using Tapatalk
Awesome! Just so happens, the CEO is a big stock car and dirt track racing fan! Sent from my iPhone using Tapatalk
Stick a fork in it… I’m going to call this one done. Aside from the ramp arrangement, this kit is done.[IMG] Sent from my iPhone using Tapatalk
That is a good question. I thought about making it one side only, so trucks would have to turn and back onto the scale / load-unload shed. That...
I agree, I nearly finished everything this morning and worked with the arrangement more. [IMG] [IMG] Sent from my iPhone using Tapatalk
Arranging the Mill Trying to decide on an arrangement of structures for the farm service buildings at Walton. I have a Blair Line feed store I...
[IMG] Subtle rust applied Sunday night. I have a bottle of “concrete” colored paint I may add a little in some places for a general environmental...
Just go with it… I wasn’t completely happy with the weathering, but I decided to keep working on the cement silos for Little Kanawha Valley Stone...
Temporary scenery applied around the Tower at the south end of Spencer. Except for the track, none of this is permanent. I have my eye on a couple...
Yard crew assembled the train, car inspector looked everything over, but pull a knuckle and it’s the train crew who has to pee in a cup and get 15...
Included in the operating agreement is for the state to maintain ownership, maintenance costs to be shared 50/50 between the state and Omnitrax....
By Railfan & Railroad Staff OmniTRAX took over West Virginia’s South Branch Valley Railroad on December 1. The South Branch Valley operates on...
Thread Note: The last train was loaded on 11/17/23. The two leased SW’s LTEX #1106 and LTEX 1118 were picked up on 2/18/24 by the A&O and...
Sounds like a plan, I’m looking forward to seeing your work on the Indian Rock! Sent from my iPhone using Tapatalk