This past Februray Les Dahlstedt presented a clinic on layout height. Here is a link to the power point and pdf versions...
Major redesign of 90% of the layout Since Feburary I've been redrawing and re thinking my layout. Much of the design I had oridginally proposed...
Secured air rights in passageway to Sharon's studio.
After the track has been wired and well tested, the right of way gets paved.
some track in place, and a few building mock-ups
Thinner layer supports I wonder if any of you are using thin supports between levels on your layout. I at this point have 5" of structure under...
The party was a hit. The party was almost as much fun as having a group over to work on the layout. [IMG] As a finial post, the road bed is...
Last Week I've gotten a bit off track. (poor pun) This week I hope to start laying track. I got some building mock-ups done. So my priorities are...
Hit a slow speed limit area As I had said, I want to mock up the buildings before finishing the backdrop. To get the footprints of the buildings,...
I am using sanborn maps to help get the arrangment of the tracks and structures about right.
this industry I'll try to do full sized