The Railfair weekend was today at Livingston. The layout is coming along nicely, with a bunch of little changes since the last time I saw it. Here's some pics and a video, This is tucked in under a loop of the layout,
It was started back in 1993 or 4. The neat thing is that most of the benchwork on the original section, the roundhouse and yard and loops part, was built with the remnants of the teak crates the depots bricks were shipped in! The NP / BN never cleaned out the basement of the baggage building, so they just laid there. Neat tie in to the history!