ZELLIN layout

zdrada69 Aug 11, 2015

  1. zdrada69

    zdrada69 TrainBoard Member

    1,110
    4,344
    51
    Hello,
    My name is Pawel and I am a Polish guy who started his first Z-gauge layout in January 2015. I hope to get some feedback as well as some information concerning Z modelling. Polish Z gauge community is very small one (we have 70 members registered on our forum and most of them are still in the "planning the layout stage"). Z scale stock is not very popular but we do have an Internet and Germany - the birthplace of Z scale is our neigbouring country. I also hope to improve my English as a side effect of forum activity.

    My story with Z scale started 10 years ago with some purchase of Marklin starting kit and some buildings by Kibri and Faller. Some buildings had been assambled and ... nothing happened until last Christmans...
    Thinking about my first ever layout I decided to have something portable, preferably based on modules, not extremally realistic in terms of operation which is a current trend in Poland's greater scales (mainly HO) with long lines of modules operated on principle of point to point train movement. Some Internet search, some considerations and I decided to plan something based on Z Bend concept. The first "end" module is representing a small branch line with train stop with lumber loading facility connecting two main double lines (in fact this is the same line of course - but I will try to make some ilusionary differences between them). There will be a village and the loop will go in the excavation (?)/cutting (?).
    The general planning of the module have been done using SCARM. The module will be done using standard Marklin tracks. You can find the plan below:

    makieta z - end -las.jpg

    And some 3D image:

    makieta las.jpg
    The second "end" module is intended to be "mountain area" with some tunnels.
     
    CNE1899, Kez and FriscoCharlie like this.
  2. ZFRANK

    ZFRANK TrainBoard Member

    933
    549
    28
    Hi Pawel,

    Looks like a nice start! Share some picures of the progress of your modules.

    /Frank
     
  3. zdrada69

    zdrada69 TrainBoard Member

    1,110
    4,344
    51
    The construction of the first module started in January 2015 with the construction of wooden "box" 60cmx90cm made out of the 9mm playwood. The 1:1 plan of the layout was also printed to help the job.
    IMG_0427.JPG

    3mm insulation foam panels were used as a trackbed and standard Marklin tracks were laid using double sided foam tape (I must say that I do not recommend that technique because you practically do not have possibility to adjust your tracks). I must admitt that balalsting the track is fast but I was not satisfied with it's quality so I addet some ballast using white glue:
    IMG_0487.JPG

    Sides of the rails have been painted using Humbrol pains 9mixture of two colors):

    IMG_0506.JPG

    I tried to produce some trees - but I was definitely not satisfied with the results: they finally ended in waste bin:

    IMG_0510.JPG IMG_0509.JPG

    I also started some work with buildings:

    Old Artitect reisin kit (still not fully finished and tuned)

    IMG_0522.JPG

    MBZ carton model:

    IMG_0421.JPG
    That was January job.
     
    CNE1899 and FriscoCharlie like this.
  4. ddechamp71

    ddechamp71 TrainBoard Member

    2,153
    653
    46
    Nice work... ;)

    I don't know which prototype you're working on. If it's Polish, Marklin released a while ago a locomotive whose brand is from former eastern Europe, the "Ludmilla". I guess it was east german, or tschek, and I think a bunch of these still operate in Poland.

    Dom, from nearly neighbour France
     
  5. zdrada69

    zdrada69 TrainBoard Member

    1,110
    4,344
    51
    Well, I forget to place an information that Zellin is an imaginary place in West Germany. This was determined by the rolling stock I had. Polish rolling stock is practically anawailable in Z. There are just a few waggons produced by small series producers. "Ludmilla" was not used by PKP (Polish State Railways). In last 15 year we do have some "Ludmillas" used by private cargo companies.

    Some additional information: the layout is intended to represent III Era - end of 50ties - beginnig of 60ties. As far as period of the year is concerned - it is late spring: end of May or beginnig of June.
     
  6. JoeS

    JoeS TrainBoard Member

    3,209
    1,240
    64
    Keep showing updates, as I really enjoy seeing people work, it inspires me to do more
     
  7. zdrada69

    zdrada69 TrainBoard Member

    1,110
    4,344
    51
    Second month of construction (February):
    All the tracks were laid down and ballasted. I used three colors of ballast to show that there are 3 different lines : two main double track lines and the branch line.

    IMG_0554.JPG

    First work on the road crossing:

    IMG_0560.JPG

    IMG_0685.JPG

    Preparation of the terrain (several shaped layers of insulation foam with toilet paper glued by mixture of white glue and green acrylic paint.
    IMG_0589.JPG

    Preparation of the timber loading area (2 mm carton painted and coloured with Artitect pouders)

    IMG_0616.JPG

    Checking movement of the waggons:
    IMG_0619.JPG

    End of the track is not used so there is a small grass attack and the rails are rusted:
    IMG_0739.JPG
     
    CNE1899 likes this.
  8. Curn

    Curn TrainBoard Member

    752
    497
    31
    Pawel,
    I like the look of the modules you are making, especially what you are doing with the seldom used rails being overtaken with grass. Keep posting progress!
     
  9. zdrada69

    zdrada69 TrainBoard Member

    1,110
    4,344
    51
    Construction month No 3 (March) Part I

    Roads are placed on their places (roads are ready to use NOCH products). There are also first shapes of terrain made out of special foam we called "styrodur".

    IMG_0755.JPG

    There is some more low green vegetation - both on the hill as well as next to tracks

    IMG_0765.JPG

    IMG_0789.JPG


    I also did some tests withe the clearence of long Marklin carriages on the curves next to the hill.

    IMG_0770.JPG


    Due to the fact that the hill is very steep in some places I put a small wall (scrap box's elements left from assambly of Kibri house kit). It is also time to check for the first time how the flat car with timber load looks like in the loading area.

    IMG_0775.JPG
     
    CNE1899 and Kez like this.
  10. ddechamp71

    ddechamp71 TrainBoard Member

    2,153
    653
    46
    Good job. Especially removing the ugly side mechanisms from Marklin turnouts. How do you power these now? Tortoises?

    Dom
     
  11. zdrada69

    zdrada69 TrainBoard Member

    1,110
    4,344
    51
    Well, It is my first layout and probably one of the mistakes. I was not able to find sufficient way to power turnouts so they are still not powered :cry:. I planned to use Conrad mechanisms but had some problemswith too big "jump" of the mechanism against small Z tournouts. I gather information and at the moment next try will be with servomechanism (actuator ?) for plane and car models with some electronics. As the result there should be good control of "jump" as well as speed (this should be nice looking).
     
    ddechamp71 likes this.
  12. zdrada69

    zdrada69 TrainBoard Member

    1,110
    4,344
    51
    Construction month No 3 (March) Part II

    The first building have been installed. This is ZELLIN small railway station:

    IMG_0774.JPG

    In front of the station there is a road:

    IMG_0810.JPG

    I did not liked the look of the road next to the station so I decided to do some "construction work" and make a parking place

    IMG_0815.JPG
    The remaining part of the terrain was created using styrodur:

    IMG_0785.JPG

    Timber loading place got eventually some timber, crane and small building for people working there:

    IMG_0821.JPG

    IMG_0852.JPG

    The ground road was created:

    IMG_0831.JPG

    but it looked very narrow and not safe for drivers using it, so I decided to work a bit on a perspective and optical illusion techniques. Finally I decided to add some bushes next to the road:

    IMG_0833.JPG
     
    CNE1899, FriscoCharlie and mdvholland like this.
  13. zdrada69

    zdrada69 TrainBoard Member

    1,110
    4,344
    51
    Construction month No 3 (March) Part III

    I have visited old unused railway line 2 hours driving time from my place. I havemade some interesting photos of old raod bridge:

    IMG_0655.JPG

    IMG_0652.JPG
    That inspired me to start my first schratchbuilding project. It is not an exact model but something based on this actual bridge. It had to fit into a place on layout which was limited and not permitted to make an exact model:

    IMG_0905.JPG
    Installation of the bridge permitted to arrange some photos:

    Installation:
    IMG_0858.JPG

    Weight tests:

    IMG_0898.JPG
     

    Attached Files:

    CNE1899 and FriscoCharlie like this.
  14. zdrada69

    zdrada69 TrainBoard Member

    1,110
    4,344
    51
    Construction month No 3 (March) Part IV (the last one)

    Small plot of land ready for planting patatoes:

    IMG_0924.JPG

    The platform was extended - this is a small station so there is only sand on it:

    IMG_0936.JPG
    There are first small trees next to the rails - this part has not been cleaned by forresters, so there are still some trunks of dead trees:

    IMG_0921.JPG

    It is also a time to have some trains on the rails. As one can notice I weathered the ballast next to the track.

    IMG_0865.JPG
     
  15. John Bartolotto

    John Bartolotto TrainBoard Supporter

    1,531
    1,060
    46
    Pawel,

    WOW!! You've been very busy!! The layout looks great!

    John
     
  16. JoeS

    JoeS TrainBoard Member

    3,209
    1,240
    64
    This really is some good work! Really enjoy seeing you use prototype references and trying to get track looking right. I really like seeing that the most.
     
  17. zdrada69

    zdrada69 TrainBoard Member

    1,110
    4,344
    51
    Construction month No 4 (April) Part I

    The genaral shape of the terrain, tracks and roads are in their places. It is time to follow up with landscaping and buildings:

    IMG_0940.JPG
    For sure this is an construction project - so let's start with construction of the building. The first step is to get down into the ground:

    IMG_0942.JPG

    Ledder is a must ! Unfortunately there there some ecological problems: it was necessary to cut a tree.

    IMG_0964.JPG

    There should be more construction material for further development of the project:

    IMG_1184.JPG
     
  18. John Bartolotto

    John Bartolotto TrainBoard Supporter

    1,531
    1,060
    46
    Pawel,

    That is a fantastic idea of showing the building foundation!!

    John
     
  19. zdrada69

    zdrada69 TrainBoard Member

    1,110
    4,344
    51
    Construction month No 4 (April) Part II

    The railway station get it's name Zellin. This is an imaginary village in Germany. The name's origin is connected with my family. Celina (Zellin) is may oldest daughter.

    IMG_1160.JPG
    IMG_1152.JPG
    There is work on the plot of land. I planted young patatoes (or maybe corn ?)

    IMG_1051.JPG
    There are also fountations of paths leading to the houses (still not in the place at the moment):

    IMG_0966.JPG
     
    CNE1899, gmorider and FriscoCharlie like this.
  20. subwayaz

    subwayaz TrainBoard Member

    3,222
    106
    44
    Very well done. Real looking. I'll be watching your progress.
     

Share This Page