dragenrider

1980's--streamlining operations

In the 1980's the CB&W bought a couple of more engines, this time second generation EMD's. They hung on to older GP 9's and had them reworked to assist with the longer, heavier trains.

Tags:
1980's--streamlining operations
dragenrider, Jun 17, 2006
Kurt Moose likes this.