2004 Construction Project of "track rework"
In 2004, all track on the front of the layout was "ripped up" and re-installed. The improvements have been a good benefit to smooth operations.
-
There are no comments to display.
In 2004, all track on the front of the layout was "ripped up" and re-installed. The improvements have been a good benefit to smooth operations.