pachyderm217

Operational Scenario 2

This scenario option uses an existing 'tunnel' as the continuous run connection. The tunnel runs along the back of the layout at the lowest elevation.

Operational Scenario 2
pachyderm217, Feb 3, 2008
    There are no comments to display.
  • Album:
    Trackplan
    Uploaded By:
    pachyderm217
    Date:
    Feb 3, 2008
    View Count:
    867
    Comment Count:
    0