Moose's Workbench Activities 2

Moose2013 Mar 1, 2022

  1. Moose2013

    Moose2013 TrainBoard Member

    747
    3,490
    47
    Just as another clarification on how this proposed panel might work...

    Moose intends to wire the bipolar LED's so that an LED will be green if the route is open and red if the route is closed, and if a turnout changes from one position to the other position, then the LED's change to the opposite colors accordingly.

    This seems particularly important for trains heading towards the yard from the Logging branch. See example below.

    Example

    See images below. Assume an approaching train is on the logging branch-line and is heading into Oban Yard's track A/D #1.

    Left-hand image:
    • Toggle switch #4 is down, therefore the cross-over between the mainline and the yard is closed and the cross-over LED is red.
    • The LED's between the turnout #3 and cross-over #4 are both green.
    • An approaching train from the Logging branch-line can enter the yard at turnout #3 and continue to track A/D #1 without stopping.
    Right-hand image:
    • Toggle switch #4 is up, therefore the cross-over between the mainline and the yard is open and the cross-over LED is green.
    • The LED's between the turnout #3 and cross-over #4 are NOT both green.
    • An approaching train from the Logging branch-line can enter the yard, but must stop at turnout #3 until cross-over #4 is switched.
    2022 12 27 Example Switching.jpg
     
  2. Moose2013

    Moose2013 TrainBoard Member

    747
    3,490
    47
    Moose printed off the concept panel and hung if from the current panel ... Still not sure about though... :unsure:
    2022 12 27 PanelDraft.jpg
     
  3. Moose2013

    Moose2013 TrainBoard Member

    747
    3,490
    47
    Moose tried to measure driver traction tire as installed on a Con-Cor 4-8-4: OD = ~ 12.05 mm, ID = ~ 11.85 mm, T = ~ 0.20 mm, W = ~ 1.15 mm

    Given that a stretched rubber traction tire will be thinner & wider when installed than before installed, what would be an appropriate tire size from above linked store?

    Moose no want to have too thick or too thin a tire after installation, and Moose no wanna buy two sets of different sized tires Moose and be left with a set Moose no can use.

    The non-traction tire drivers appear to be OD = ~ 11.90 mm, so Moose is guessing that a ID = 11 mm, W = 1.0 mm, T = 0.35 mm would be best. Just looking for some "warm fuzzies" from others about this...
     
    BNSF FAN, badlandnp and DeaconKC like this.
  4. badlandnp

    badlandnp TrainBoard Member

    4,587
    16,154
    90
    Warm fuzzy slippers for them hooves?

    Those dimensions sound about right.
     
    BNSF FAN, DeaconKC and Moose2013 like this.
  5. Moose2013

    Moose2013 TrainBoard Member

    747
    3,490
    47
    @badlandnp

    Well, you know ... A warm fuzzy is better than a cold prickly... :cautious:
     
  6. Moose2013

    Moose2013 TrainBoard Member

    747
    3,490
    47
    Moose install DCC decoder in Atlas GN SD7. While it was apart, Moose removed a whole carpet made from black fibers and about 12 oz. of putrid grease ... Lesson learned: Don't buy used. Or was the lesson, don't by a disease'el? Yeah, could be both...

    20230106 AtkasSD7DecoderInstallCleanLube1.jpg 20230106 AtlasSD7DecoderInstallCleanLube2.jpg 20230106 AtlasSD7DecoderInstallCleanLube3.jpg 20230106 AtlasSD7DecoderInstallCleanLube4.jpg 20230106 AtlasSD7DecoderInstallCleanLube5.jpg 20230106 AtlasSD7DecoderInstallCleanLube6.jpg 20230106 AtlasSD7DecoderInstallCleanLube7.jpg 20230106 AtlasSD7DecoderInstallCleanLube8.jpg
     
    BoxcabE50, Pfunk, DeaconKC and 4 others like this.
  7. Moose2013

    Moose2013 TrainBoard Member

    747
    3,490
    47
    And the rest of the story...
     

    Attached Files:

  8. Moose2013

    Moose2013 TrainBoard Member

    747
    3,490
    47
    Then Moose let disease'el run on the MT&P tracks ... Then Moose realize it's a disease'el after all and put a stop to it!
    20230106 AtlasSD7DecoderInstallCleanLube15.jpg 20230106 AtlasSD7DecoderInstallCleanLube16.jpg
     
    marty coil, BoxcabE50, Pfunk and 6 others like this.
  9. mtntrainman

    mtntrainman TrainBoard Supporter

    10,030
    11,145
    149
    OHHhhhhhhhhhhhhhh...so you are trying to say steamers don't get fur balls in em ??
    Oh please !! :LOL::LOL::LOL::LOL::LOL::LOL::LOL::LOL::LOL::LOL::ROFLMAO::ROFLMAO::ROFLMAO::ROFLMAO::ROFLMAO::ROFLMAO::ROFLMAO::ROFLMAO::ROFLMAO::ROFLMAO:
     
  10. BNSF FAN

    BNSF FAN TrainBoard Supporter

    10,030
    30,018
    153
    It's Moose for the win on getting that great looking SD back up to good running order. Nice work. My only suggestion is you should step aside and let her run :D
     
    DeaconKC, mtntrainman and Moose2013 like this.
  11. Moose2013

    Moose2013 TrainBoard Member

    747
    3,490
    47
    @BNSF FAN

    Step aside and let her run? Never!
    :mad:

    Oh, Moose forgot to mention that the contact strips had grooves worn into them where they contact the the trucks' contact plates. Moose had to blend them out with a sandwich stick.
    :unsure:

    Yes, really, a sandwich stick ... ... ... Stupid auto spell...
    :mad:
     
  12. JMaurer1

    JMaurer1 TrainBoard Member

    2,319
    1,762
    53
    Sniffs and sneezels spreads disease'els
     
    BoxcabE50, badlandnp and BNSF FAN like this.
  13. Moose2013

    Moose2013 TrainBoard Member

    747
    3,490
    47
    Moose keeps forgetting ... ... ... to post photos of some stinky smelly projects on moose-bench! :(

    Moose has the urge to convert perfectly good tenders into monstrosities...

    Great Northern 0-6-0 A-9:

    Moose converting a Bachmann 0-6-0 switcher and slope back tender. Major alterations locomotive boiler and tender shells and version 1 of the cab:
    20230117 060PuttyRnd1.jpg

    Version 1 of the cab seemed way too large when compared to other locomotives, so Moose whipped up the smaller version 2, shown next to version 1 here:
    20230201 GN060A9CabVers1and2.jpg

    Version 2 of the cab shown sitting behind the modified boiler shell:
    20230201 GN060A9CabVers2withBoiler.jpg
     
    BoxcabE50, SP-Wolf, BNSF FAN and 5 others like this.
  14. Moose2013

    Moose2013 TrainBoard Member

    747
    3,490
    47
    Another monstrosity...

    Northern Pacific 2-8-8-2 Z-4: The shell shown here mostly assembled, with the front doors to the coal bin & the platform temporarily in place to check fit-up:
    20230202 NP2882Z4TenderTestFitDoors.jpg
     
    BoxcabE50, SP-Wolf, BNSF FAN and 5 others like this.
  15. Moose2013

    Moose2013 TrainBoard Member

    747
    3,490
    47
    And one more monstrosity...

    Spokane Portland & Seattle 4-6-0 D-5: The tender shell shown mostly assembled, with the oil tank temporarily in place on the tender body to check fit-up:
    20230202 SP&S460D5TenderTestFit.jpg
     
    BoxcabE50, SP-Wolf, BNSF FAN and 5 others like this.
  16. badlandnp

    badlandnp TrainBoard Member

    4,587
    16,154
    90
    Oooh yes!! The creative wheels are a spinning twixt them antlers!!!

    Looking great!
     
    BNSF FAN, DeaconKC and Moose2013 like this.
  17. Moose2013

    Moose2013 TrainBoard Member

    747
    3,490
    47
    Moose experimenting with scratch-built draw-bars. Need something to connect a Spectrum tender to an Athearn locomotive. The biggest issue concerns how low the tender stock draw-bar attachment is compared to that of the locomotive. Moose will have to drill & tap a screw to the tender's metal chassis to elevate the attachment, but there will still be a height difference.

    One test draw-bar has six details: two pairs of draw-bar halves attached by a pair of vertical details. This creates a bending moment that might pry apart over time.

    Each of the other two test draw-bars are a pair of draw-bar details, each with two scribes where they are bent into z-shapes, and then glued together. One was supposed to be without scribes, but Moose the-all-hooved-wonder accidentally scribed both pairs.

    Moose performed a "light" pull test on each of them. The scribed ones started to fail at the scribes, so will have to try again WITHOUT the scribes...

    20230201 MTP4664Z6DrawbarDetails.jpg 20230203 NP4664Z6TestDrawbars.jpg
     
    Last edited: Feb 4, 2023
  18. Moose2013

    Moose2013 TrainBoard Member

    747
    3,490
    47
    Moose upgraded the Quattro (paint booth) with a proper light -- now Moose can see!

    Night time:
    20230417_LightOff_SM.png

    Day time:
    20230417_LightFull_SM.png
     
  19. freddy_fo

    freddy_fo TrainBoard Member

    1,106
    4,390
    47
    Been thinking it's been a while since I saw any of your posts. Glad to see you back at it. Hopefully some paint results with your new light soon.
     
    BNSF FAN and Moose2013 like this.
  20. Moose2013

    Moose2013 TrainBoard Member

    747
    3,490
    47
    Moose has been experimenting with the new airbrush using AK Interactive Primer, Createx Reducer (acrylic thinner) and Vallejo Airbrush Flow Improver. Finally seemed to have figured out a mix ratio and how to spray, at least well enough for a primer application.

    Here's the scratch-built SP&S D-5 tender, primed. Stopped at this point as the rather poor putty application needs Moose's fumbly-hooved attention...

    20230421 SPS D5 TenderPrimeFinalCoats2_SM.png
     
    SP-Wolf, BoxcabE50, badlandnp and 8 others like this.

Share This Page