Layout progress poll - where are you at?

N_S_L Sep 1, 2004

?

Layout progress - where are you at?

  1. Planning stage - only on paper, CAD, etc

    34.0%
  2. >25% complete - wiring, base, etc

    31.2%
  3. 25%-75% complete - main trackwork, infrastructure, topography

    21.9%
  4. <75% complete - final scenicing, last minute items

    5.1%
  5. Finished, just doing touchups & detailing

    4.7%
  6. Huh? What layout

    3.3%
  1. Mr. Train

    Mr. Train TrainBoard Member

    1,312
    145
    34
    Here is a small start of the HO we have more photos of the N-scale waiting for a home here on railimages, work is still in progress. If the below link doesn't work sorry. I was just there and some of the photos seem to be missing, this is not my site to manage so I can't fix it. http://drennan3751.googlepages.com/home
     
  2. Wolfgang Dudler

    Wolfgang Dudler Passed away August 25, 2012 TrainBoard Supporter In Memoriam

    3,794
    355
    49
    Nearly all track is laid. I build in Horrobly 0versized.
    The new yard at Westport is not sceniced.


    [​IMG]

    Third Street Industrial District is nearly finished, just doint touchups & detailling:

    [​IMG]

    Plywood District and Harbor District have some scenery but also bare plywood - I mean cork.

    [​IMG]

    [​IMG]

    Wolfgang
     
  3. Ryan 79

    Ryan 79 TrainBoard Member

    251
    0
    14
    I am in the middle of building the world's most expensive backdrop. If you think I'm kidding, I need to order another $700 worth of "parts" for it, and I'm not even sure that will finish it.

    It will be awesome looking if I ever get it done.
     
  4. mrplatts

    mrplatts New Member

    3
    0
    10
    Hi, still on paper but certainley taking shape. thanks to everyone.
     
  5. RR Redneck

    RR Redneck TrainBoard Member

    14
    0
    11
    I still need to get half the town "built" and put downn some more grass and last minute items.
     
  6. okane

    okane TrainBoard Supporter

    1,923
    860
    43
    MrPlatts and Eric (RRREDNECK)

    Why not consider joining the Layout Party in The layout design Forum. We are always looking for participants, and still lots of time left.
     
  7. Zandoz

    Zandoz TrainBoard Member

    248
    1
    13
    I guess my phase would best be called frustrated CADing. I'm having problems coming up with something that fits my space, curve radius, Unitrack, and accessibility limitations. My N scale Unitrack layout needs to fit our dining room table (42"x62") with no more than a few inched of overhang. Room layout will make it basically a "viewed from 2 sides" affair. The thing that got me to go N/Unitack was the Kato Super Chiefs...which means a 15" main minimum radius, and 19" better.

    So far, everything I've come up with that I liked initially, after a few days looks seriously defective/inadequate <shrug>.
     
  8. Bookbear1

    Bookbear1 TrainBoard Supporter

    642
    914
    36
    Well, this is my third layout. Its done for all practical purposes, just some very minor detailing left. HOWEVER..... :teeth:

    I have my eye on one corner. I may rip out the small oil storage facility there and put in an open air rail museum. I also want to scratch build a modern 'extension' on the 30's art deco style 'federal office building' that would span three tracks......

    No, the layouts are never really done, are they?
     
  9. ADulay

    ADulay TrainBoard Member

    12
    0
    12
    Man I hate it when somebody replies in this thread as then I have to read it and then I realize that I'm WAY behind on my layout.

    Oh well, back to the drawing board, again, and maybe I can keep at it longer than usual.

    AD (procrastinating for fun and profit)
     
  10. Kisatchie

    Kisatchie TrainBoard Member

    1,031
    1,322
    44
    I'm beginning to think I'll never have a layout. Nuts.:cry:

    "Hmm... Kiz has four pieces
    of Kato Unitrack..."
    [​IMG]
     
  11. dascrab

    dascrab E-Mail Bounces

    59
    0
    14
    Unitrak inverted triple loop with a siding on the floor. Roads, buildings, cars, people. I guess it's more dreaming than planning. At least I'm up and running. I have plenty of excuses not to do a permanent layout. I just need to find one to build it. RICK
     
  12. Metro Red Line

    Metro Red Line TrainBoard Member

    2,499
    724
    47
    I'm at this stage:

    [​IMG]
    Overview of layout

    [​IMG]
    My new Walthers well cars carry some APL containers as they emerge from the site of a future tunnel portal on the double-tracked main.

    [​IMG]
    View of the UP stack train speeding by. New trackage is on the left, and behind is the foam riser for the overhead tracks. The flood control channel cuts diagonally though the scene.

    [​IMG]
    A stack train on the double-track mainline runs through a canyon into a future tunnel. The design to the left of the tracks is where a riverbed will be made.
     

Share This Page