The Southview Lines is Expanding

mdrzycimski Jul 26, 2010

  1. mdrzycimski

    mdrzycimski TrainBoard Supporter

    579
    3
    28
    No problem Doug. You know I would never censor a comment from you.

    I am quite pleased with how it's turning out. It's about time to clean all the track and run a few trains. I need to add some turnout controls and feeder wires. It is coming along though.
     
  2. mdrzycimski

    mdrzycimski TrainBoard Supporter

    579
    3
    28
    Golden Spike Laid!!

    I have completed the trackwork on my extension and connected it to the existing layout. Here are some pics.

    [​IMG]

    [​IMG]

    This is where the tracks will cross a city street over plate girder bridges. The bases for the bridges are .60 styrene that is attached using the same adhesive caulk I used elsewhere. I plan to scratchbuild the bridges. These will be ballasted bridges so the base will not be seen in the finished product.

    I am now hooking up feeder wires and working on turnout control. But, I also plan to run a few trains to test out the trackwork.
     
  3. mdrzycimski

    mdrzycimski TrainBoard Supporter

    579
    3
    28
    Feeder Wires

    I installed all of the feeder wires for the new extension. Here are the pics.

    [​IMG]

    [​IMG]
     
  4. mdrzycimski

    mdrzycimski TrainBoard Supporter

    579
    3
    28
    Turnout Controls

    Finally, I have finished installing my manual turnout controls for the new extension. I use minature slide switches to throw the turnout and route power to the frog. Here are the pictures to show the installation. You can read a deatiled description of how I installed them at my blog. http://southviewlines.blogspot.com

    [​IMG]

    [​IMG]

    [​IMG]
     