Last week, I've built up, weathered and installed my Engine Service Terminal on the layout. A sanding tower and an inspection pit will be added next.
My current engine roster: 2 x GP30, 3 x U23b, 1 x GP15-1, 1 x GP40-2, 1 x GP40, 2 x U18b, 3 x SD26. Some more stuff will be added in the next...
In the foreground are the 3 engine service tracks, in the background are the 4 yard tracks and the run-through track in the middle (in front of...
On this picture, one can see the 4 head-end yard tracks and the run-through track in the foreground.
On the righthand side are the 4 yard tracks, on le lefthand side are 3 engine service facility tracks. A sanding tower and some fuel pumpf will be...
Finally, after months of planning, consideration and re-consideration, I've started work on my new, Guilford oriented layout in H0 scale. It's...