I like to get the kids involved, so they feel like they helped build it.
Covering the tunnel. And shaping the river.
Cut out for the tunnel.
Restuck using Loctite construction adhesive, weighted with length of Code 2500 rail.
Restuck using Loctite construction adhesive, weighted with 13,000 year old fossilized thighbone of woolky mammoth
2" foam atop 1/2" plywood, serves as the subraodbed base for the Riverside and Bridge areas. I was able to cut all peices using...
Pink foam on 1/2" plywood. Installed as subroadbed in East Bridge, Trestle and Riverside areas.
Removable module for Riverside area. Pink foam on 1/2" plywood. Installed as subroadbed in East Bridge, Trestle and Riverside areas.
Foam glued to 1/2" plywood. This sheet will be used for the East Bridge, Trestle, and Riverside areas.