Last section of south deck installed. Oops I cut it 1" too short.
East and South valance frames drilled for attaching togehter.
East and South valance frames clamped for drilling.
East valance frame skin added.
East valance frame.
South valance frame in progress.
East Frame Deck
South Frame Closeup
East Frame Closeup
East and South Frame
East Frame
I bought a package of Model Power cork roadbed on clearance. Oddly enough it is only 1" wide as opposed to Midwest roadbed which is 1...
I used 2" screws with fender washers to hold the foam down to the frame while the glue was drying. I can easily fill the divets with wood...
I found theese brass handles at the Habitat for Humanity store in Seattle. They cost $2 for 4 handles. It definitely helps to have something to...
Wired for oNeTrak with green & red bus, accessory bus, and loconet. The wires meet in the middle at a barrier block.
Close up of diagonal bracing and pocket and catch for legs.