The Kneewall framing is almost done. Next is framing over the stairs and framing out the HVAC closet.
3/17/06 - More modules. Where benchwork is along the walls, I have elected to use 3" deck screws into the wall studs and cantalevered support...
3/17/06 - Kreg K3 Standard Jig. So far I have only had to use 2 drywall screws in the entire construction - look ma ... no splitting.
3/13/06 - Here is a detail of the pocket hole joint construction that Don Zimmerman uses. This is without a doubt one of the easiest joint...
3/12/06 First section is in place but not secured. There will only be two legs on the front after the back where the leveler is sitting is screwed...