Finishing the ballast on a section the Western Pacific / paired track east bound near Golconda.
The 3 ft Golconda section is installed and the SP track connected to the Wesso section.
Gloconda section is mounted in layout.
Some scenery along the river has been finished and the section is ready for the bridges and track to be installed.
Another angle of the segmented concrete bridge on the SP line at Golconda.
This is the scratch built segmented concrete bridge on the SP line at Golconda. Base scenery has been started.
Bridge abutment for the WP bridge on west side of the Humboldt River in Golconda.
Central Valley Model Works bridge at Golconda. This is looking east. Piers for the segmented concrete bridge are seen at the rear covered in...
Scenery has started on the Golconda section. This view of a Central Valley Model Works bridge from east side of the Humboldt River looking west.