Initial configuration of main yard is temporarily tacked down in order to provide the opportunity to allow mock operations for evaluation and...
I had opted to use code 100 track on this layout because I has so many Peco code 100 insulfrog turnouts left over from a previous layout and I had...
Extra 601 holds the main while LK rolls into the siding
Garbage day on Main St. Scenes around the Elkhart Model RR Club
Tiny N-scale layout control panel. Fiber optics illuminate powered yard lanes and blocked main segments. To see the control panel in operation,...
Main deck permanent framing stretching across the window. Note the cross pieces are above the support on each end, but lower in the middle - this...
Finished the main deck permanent framing and wired lights. There's now 72W of fluorescent tubes shining down on the staging deck (main deck only...
Adding more framing for the main deck, working on the helix approach end. One more board to go
Adding more (permanent) framing for the main deck, working on the helix approach end - it's screwed to the helix supports
Adding more framing for the main deck, fascia support beam in place
Before and after shots of the main deck framing going up. This isn't everything; there's a lot more work to go yet, I just ran out of daylight.