2012 - Model Railroading Goals?

DragonFyreGT Jan 1, 2012

  1. mtaylor

    mtaylor Staff Member TrainBoard Supporter

    2,772
    185
    49
    My 2012 Modeling Railroading goals are as follows:
    1. Complete electrical wiring of office layout
    2. Assemble, detail, and place all layout structures
    3. Glue all trackwork down
    4. Begin initial scenery detail on office layout
    5. Add building lights, street lights, grade crossings
    6. Expand rolling stock roster (cars)
    A. More grain hoppers (BNSF,BN, CP, Soo Line, Misc Roads
    B. More box cars - BNSF, CP, CN, WC, Rail Box, misc
    C. More covered hoppers for plastic pellets, centerbeam flats, and tank cars for fuel oil
    D. More coal hoppers and coalporters for BNSF coal trains

    7. Expand Amtrak equipment (first for office layout and then attic layout & club operations
    8. Install fasica on layout
    9. Complete Digitrax equipment install for office layout (is already operational but not all parts installed at the moment)
    10. Expand Locomotive roster
    A. CP GP40 with DCC & Sound for office layout
    B. 3 BN SD45 locos (will be used mainly for attic layout and club operations)
    C. CSX and more NS power for run through power for attic layout
    D. Soo Line F7 A&B just because
    E. More BN power other than what I currently have as this can be used both on the attic layout and Club.
    11. Install DCC and Sound in all of my Genesis SD70 series locos
    12. Outsource DCC and Sound Install for my TCW Proto 2000 locomotives

    So with exception of purching more rolling stock for the office layout, and future attic laout most of the focus for the year will be on continued building and detailing of the office layout.
     
  2. Shortround

    Shortround TrainBoard Member

    4,411
    5,281
    93
    I definitely didn't forget the girls. They were the best part of the show.
    I don't care what others may say, I think I would like my daughters to be a lot like you. :pwink:
     
  3. DragonFyreGT

    DragonFyreGT TrainBoard Member

    991
    60
    22

    If I have a daughter and she doesn't turn into a tomboy, my g/f and I are going to wonder where we went wrong rofl
     
  4. retsignalmtr

    retsignalmtr TrainBoard Member

    898
    4
    19
    This year I hope to finish my clubs new DCC buss wiring on the facia of our layout. On the home layout front I would like to make a new entrance to my attic so I can install a Helix in the closet that is now the entrance to the attic and build the upper level on the layout. I'm also planning to install several more working signals on it.
     
  5. HemiAdda2d

    HemiAdda2d Staff Member TrainBoard Supporter

    22,060
    27,709
    253
    Goals for the Secret Places Sub:
    Get the whole layout (HCD, all 3x7 feet of it) to the 75% scenery stage.
    Redo the fascia;prime/paint, and add a fabric skirt around the layout once the sloppy stuff is done.
    Install turnout controls.
    Ballast the whole layout

    What's done so far:
    Scenery 90% roughed-in.
    Track laid, weathered, debugged.

    Crescent area 60% scenicked
    Tunnel 18 90% scenicked
    Tunnel 19 0% scenicked
    Tunnel 25 60% scenicked
    Tunnel 26 60% scenicked

    Here's to a productive 2012!
     
  6. sandro schaer

    sandro schaer TrainBoard Member

    2,020
    87
    43
    1. build 15 more cp rail sd40-2f redbarns
    2. do another 'the canadian' in via rail colors
    3. do 10 more via rail f40ph
    4. do 6 more cefx sd45
    5. install decoders in 9 gp9 chop nose and c420.
    6. install lights in the train room
    7. add more lighted buildings
    8. continue work on the layout
    9. paint approx 20 more sd40/sd40-2 in cp rail colors
    10. add weight to hundreds of cars
    11. weather hundreds of cars
    12. paint another g-scale dash-9


    ...to be continued...
     
  7. FLG

    FLG TrainBoard Member

    126
    12
    18
    1. decide which railroad i want to model (down to two either a TN or AZ shortline)
    2. start building the railroad hahaha
     
  8. YoHo

    YoHo TrainBoard Supporter

    5,508
    2,011
    98
    1: Continue to get my stock of painted Locos DCC'd and semi-detailed (I don't superdetail, I just get them close enough)
    2: Get at least one of my more ambitious loco projects done. Preferrably one in my freelance scheme.
    3: Assuming I don't move someplace with space for a layout, build a Diorama/Module that can be plugged into the future layout.
    4: Do more work on the layout backstory.
    5: Get metal wheels under all rolling stock.
    6: Finish the tank car kits that have been languishing unfinished.
    7 Build the Bowser Coal car kits that have also been languishing.
     
  9. karnydoc

    karnydoc TrainBoard Member

    136
    0
    11
    Once I get a permanent job (my most-pressing need), followed by an apartment. Then I can begin thinking about taking up where I left off.
     
  10. Metro Red Line

    Metro Red Line TrainBoard Member

    2,497
    712
    47
    Finally jump in the water and go DCC (I've been saying that for the past five years, so take it with a grain of salt...).
     
  11. Jim Wiggin

    Jim Wiggin Staff Member TrainBoard Supporter

    5,251
    6,430
    103
    1. Build, document and write up an article on a B&M GP38-2 in Bicentennial colors, #200.
    2. Finish the the roadway on my Potter Place side of the layout.
    3. Get blue prints of Potter Place station, convert digital, scratch build said structure.
    4. Build Route 11/4 for a natural scenic divider.
    5. scenery
    6. New fascia
    7. Install DCC system
    8. Instal practical hanging system for the layout skirt
    There is a move in there on March 1st, with me and the layout going back home to Illinois. I probably will not get much done from March until August with the layout in storage.
     
  12. trainman-ho

    trainman-ho TrainBoard Member

    346
    190
    18
    Hi
    Well I would like to finish the bench work, finalize track laying, finish installing under table switches( modifying normal switch motors) and install final buses and feeder wires. Wire all those switch motors. That should take up some of the year! And that only leaves ballasting, buildings, and scenery, which on a 10 X 6 is a lot left! LOL

    Jim
     
  13. carnellm

    carnellm TrainBoard Member

    104
    3
    15
    Maybe get enough track down to actually get a train running?
     

Share This Page