    Everyone who hand lays track says the best way is to just jump in. I've been wanting to give it a go. My current layout is a Z scale variation on the Gumstump and Snowshoe with a continuous run loop added.

    First up were six #6 turnouts, followed by one #4.5. I learned a lot in the process and had a great time doing them. After the first one they turned out to be much easier than I anticipated.

    The layout needed a #4.5 double slip to do away with the last store bought switch. It seems to be working okay. I would not recommend it as a starting point but it can be done with patience and a good bit of fiddling. Materials costs are very low but labor costs are probably best not mentioned.

    Here it is operation.


    Thanks for reading.

    Take care,
    Brent
     
    sboyer2, DB_Z, southernnscale and 9 others like this.
  2. bostonjim

    bostonjim TrainBoard Member

    846
    1,105
    27
    Excellent work! Inspiring. Thanks for showing it can be done. Jim
     
  3. hoyden

    hoyden TrainBoard Supporter

    815
    778
    30
    Impressive! Southern covered wagon is icing on the cake.
     
  4. HoboTim

    HoboTim TrainBoard Supporter

    1,599
    451
    41
    BadAss!!!!!!!!!
     
  5. shortpainter

    shortpainter TrainBoard Member

    278
    900
    20
    Boss level track work.
     
  6. bcarter

    bcarter TrainBoard Member

    10
    42
    7
    Thanks for all the kind words.

    shortpainter, I will of course be looking for a SW1200 to help share the switching duties. ;-)
     
  7. shamoo737

    shamoo737 Staff Member TrainBoard Supporter

    4,596
    550
    72
    Very impressive.
     
  8. SJ Z-man

    SJ Z-man TrainBoard Member

    3,007
    1,020
    62
    Outside of keeping all in gauge, the other 2 critical details are filing the rail base in the frog area (allows the gap to be kept small, so the wheels tread doesn't drop in) and the points shaping. I have usually filed a slight set-in to the stock rails, to allow the points to set in 'flush'.

    When making some N scale versions, I found the rail base was impeding me from 'poking' the frog exit rails in far enough. This limited by the frog exit rail bases pushing up against the wing rails. Same with the guard rails against the stock rails. These guard rails are key to keeping trouble out if the frog. More info on NMRA Recommended Practices: https://www.nmra.org/index-nmra-standards-and-recommended-practices, RP-12 and RP-13.
    I was just reading an article on turnouts, somewhere, and I can't recall it. it had 'enhancements' to the RP- drawings so show the not-so-obvious relationships of the Guard and Wing rails.
     
  9. drken

    drken TrainBoard Member

    343
    193
    18
    Nice work! I've been building my own turnouts using Fast Tracks. It's definitely nice to have a choice of turnouts in Z and building them myself has been very rewarding. I haven't tried anything as fancy as a double slip, though.
     
  10. shamoo737

    shamoo737 Staff Member TrainBoard Supporter

    4,596
    550
    72
    Can you take a close up picture
     
  11. bcarter

    bcarter TrainBoard Member

    10
    42
    7
    John,

    I hope these will help. Let me know if you would like to see something specific. Thanks for your interest.
    Here are some of the parts used in the switch.
    [​IMG]

    A close up.
    [​IMG]

    I'll post a picture of the current state of the layout in another thread.