I'm going to continue scratch building the Ft. Scott Depot, have two walls cut and need to cut the remaining. Joe
HI Guys: Forgot to post yesterday, sorry about that -- Friday -- debug some rough spots in the main loop of the layout -- had a bad switch which I removed and replaced with a blank section of flex track Saturday --- A trip to the LHS for more flex track and a turnout (They were running out of them) Sunday -- Plan to fix a spot that routinely de-rails my loco and hopefully get things rolling TIM
Ouch. 3 appliances in one year. Sounds like our house. The refrigerator is keeping everything cold just not making ice so we are lucky in the fact we can wait. I went and bought a bag of ice and threw it in the ice dispenser and can keep doing that for the time being.
Hey Kitbash, thanks! I've been a BMRRHS member for a number of years and that is one of the resources I've looked into but still worth another look. Thanks!
Well, I was carrying something heavy up the steps, and my right knee said it didn't like it at all. Going down steps isn't so bad, but going up... Sanding down the spackle, still have roadbed gaps, so going to try 3×5 cards next. I have a stall point at the incline around the mountain now, so have to sand that back to its original level. Don't know why the 3% grade is causing so many problems there. Don't know when I'll get back to it. Hopefully the knee will let me do steps again this week. Sent from my SM-N950U1 using Tapatalk