This is another thread showing a layout construction from concept to completion. Actually, as this is now being posted, Another ATSF Admirer is in the process of construction this Duck River Subdivision. It is a long thread with a lot of photos and a most enjoyable narrative. This construction includes a discussion of both a helix and steep grades. This layout is N scale. Additional search terms: scenery bench work benchwork stage staging interchange yard wiring wire