Simultaneusly to the river module I am working on "double module" - 440mm long. This will be utilizing two warehouses with access by trucks from one side and disused railway acces from the other side. Main line was rebuild and old private siding abandoned but not disasamblied.
Pawel, Very nice! Weathering on the buildings and the ground cover look good. You are a machine! Scott
It is easy to make fast progress using assamblied buildings waiting in the boxes to be utilized This "warehause module" is designed to be joined with "bakery" module. It makes altotgether 660mm of agrobusiness scene:
Pawel, Nice work and good planning! I feel bad for that guy digging post holes by himself. How do you join the modules? Scott
Modules are joined together only using Rokuhan tracks joints. I did some work on river module. The idea of big mountain was abondened but I decided to add some ground relief with small rocks. Terrain was formed: Rocks painted and some vegetation added: Ground level view:
I want this river to be more mountain style with fast current. It started with Woodland Scenic "Water effects" aplication: It was drybrushed when ready:
Next idea is to have a narrow gauge britge over the mainline. The bridge is schratchbuild to follow a prototypical one 40 km from the place where I live. Earthwork is added: First check with the module:
Outstanding job! I like your set up also nice place to set trains when not running! You can still show them off! thanks for sharing!
It was actually inspired by real bridge. You can find some photos here: https://www.bazakolejowa.pl/index.php?dzial=linie&id=257&od=1&do=81&ed=0&okno=zdjecia https://www.srodawlkp.org/pliki/swpm_h3.html Great to hear from you again Walt ! The whole micro-module looks much better with grass and bushes:
Pawel, The bridge module looks great! Are you going to add rails and fence sections on top of the bridge, like the prototype? Scott