I too have always wanted to model a snow scene, just because it is so rarely done. I think you will find this layout interesting....
It's not a bad plan but operationally it has some problems in my opnion. The thing I always thought was odd about this plan was the run around....
Very nice. The new color and/or the weathering brings out the details.
I'm working with a Digitrax BDL168 on my test layout and intend to use it for detection but am having some problems. Here is a discription of my...
Over all a good looking plan. Iām looking at the yard area and the grid 24ā? is the yard about 48ā wide? Can you reach across to the back tracks?...
I model in HO, but if I was to start over I would go with 2rail O. With that being said I think some of the most innovative modeling being done...
Geat stuff so far. A Wabash F7 and GP7 switch the MFA elevator in Columbia, Mo. on a late summer day. [IMG]
John Olson did some outstanding work at about the same time mid 1980ās. I remember his HOn3 Mescal Lines layout. I always thought his work was a...
Colt2001, You are correct that is my model of the MFA elevator in the back ground. If someone familiar with the area recognized it I guess I did...
I am building a layout based on the Wabash Columbia branch set in the summer of 1964. It is far from finished. [IMG] [IMG]
I have two Atlas GP7 that are DCC ready. I installed a Digitrax decoder and all was well. Now I want sound, any suggestions on what decoder to...