Kitbash

2-6-22_2

Bridges at Jackson River with plaster painted. This is "rough" and will need touch up on the bridges weathering as well as the layout skirt that got "boogered" up while doing the plaster and painting. Picture merely shows where this is going.

2-6-22_2
Kitbash, Feb 7, 2022
Dogwood likes this.