8-25-2024_1
East Monterey panel installed. All turnouts and indication lights connected. Only needs to have on/off track switches connected for 3 locations.
-
There are no comments to display.
East Monterey panel installed. All turnouts and indication lights connected. Only needs to have on/off track switches connected for 3 locations.