TSBYman

Here's a look down the jointed track mainline which is 90 pound joint rail. the ann arbor used to run up to frankfort michigan but now do to lack of business they only run to osmer siding north of ann arbor were they interchange with the great lakes central. they don't switch in ann arbor anymore the last switching job was in 2004 at a lumber yard.

Here's a look down the jointed track mainline which is 90 pound joint rail. the ann arbor used to run up to frankfort michigan but now do to lack of business they only run to osmer siding north of ann arbor were they interchange with the great lakes central. they don't switch in ann arbor anymore the last switching job was in 2004 at a lumber yard.
TSBYman, Sep 21, 2008
Mike VE2TRV likes this.