Kitbash

IMG_2596

Construction of ME deck sections. The double track deck bridge will require 4 short sections and 2 long sections. The challenge is to join them as double track given ME does not offer a double track system for deck bridges.

IMG_2596
Kitbash, Jan 27, 2020
    There are no comments to display.
  • Album:
    Modeling Projects
    Uploaded By:
    Kitbash
    Date:
    Jan 27, 2020
    View Count:
    428
    Comment Count:
    0