MA&C roadbed construction
These photos are from my HO layout, the Middlesboro, Asheville & Charleston Railway. The layout is double deck connected by a long grade on the peninsula. Photos are of roadbed construction started in 2001. I use spline roadbed with homasote on top. Benchwork on bottom level is L-girder w/1X4 risers. Upper level is open grid hanging on 2x2 studs bolted to the block wall.
-
There are no comments to display.
-
- Category:
- Layout Construction
- Uploaded By:
- rrfotonut_MA&C
- Date:
- Mar 10, 2007
- View Count:
- 1,866
- Comment Count:
- 2