ChicagoNW

Mod 2 Upper windows removed and gaps filled in. Roof sanded smooth. Sides sanded smooth. Windows squared up. 1/16" plastic C channel used for walkway. Ventilation equipment added 1/16" plastic square and quarter round strips for vents. Track nails used for heater exhaust vents. Repainted in Chicago Surface Lines colors. Functioning trolley poles added.

Mod 2
Upper windows removed and gaps filled in. Roof sanded smooth. Sides sanded smooth. Windows squared up. 1/16" plastic C channel used for walkway. Ventilation equipment added 1/16" plastic square and quarter round strips for vents. Track nails used for heater exhaust vents. Repainted in Chicago Surface Lines colors. Functioning trolley poles added.
ChicagoNW, Dec 21, 2010
gmorider likes this.