Mr X

Overall area to be Lit

This area will require 5 blocks to light. Each wil be on seperated switches. Area #1 - Factory Area #2 - Signal Tower Area #3 - Passenger Station Area #4 - Parking Lot Area #5 - Yard Area

Overall area to be Lit
Mr X, Jan 28, 2007