Passumpsic6

Rail Saw

Sawing a rail for a temporary switch

Rail Saw
Passumpsic6, Aug 28, 2006
    • HemiAdda2d
      Now, THAT's a cool tool! I collect those little slices the saw is removing, too.
    • BoxcabE50
      A temporary switch? Am curious as to what they were doing?

      :D

      Boxcab E50
    • Passumpsic6
      The Passumpsic Railroad- a little historical railroad in VT. We built the temporary switch to remove rolling stock from the main line to a side track. We are in the process of rebuilding the main line. A long process.
    • BoxcabE50
      Is there a web site?

      :D

      Boxcab E50
    There are no comments to display.
  • Category:
    Infrastructure
    Uploaded By:
    Passumpsic6
    Date:
    Aug 28, 2006
    View Count:
    1,136
    Comment Count:
    4