geoffrey

Tunnel work

Finishing up the basic tunnel construction and interior so the upper level can be installed and track laid for the Branch-line.

Tunnel work
geoffrey, Apr 4, 2012
    There are no comments to display.
  • Category:
    Track Work
    Uploaded By:
    geoffrey
    Date:
    Apr 4, 2012
    View Count:
    1,206
    Comment Count:
    0