How do I access that?
Hello, I was really excited about purchasing the PR4 to make programming easier, I didn't realize what a pain it is to get it installed and...
Ok, This is slowly sinking in How would I wire multiple tortoises? Create a bus wire from my power source? And how would I wire turnouts where...
What kind of Switch do I need to activate the tortoise? SPDT??
DCC, I have a seperate transformer for switches
Hello, this past weekl I have been trying to understand how to wire a tortoise switch machine so I can operate leds to a control panel and also...
Hello, I am using code 80 turnouts from my previous layout on my new layout I am currently building. I plan on converting them so I can use...
1st attempts at weathering
More attempts at weathering
Another view
Learning how to add weathering
The benchwork had to be in that location, I have had several layout plans for this for quite sometime, just hasn't felt or looked right until now...
David, if I ran pieces of connected flex track from "0" to past the bridge area "2" and pin it down I could then locate the overpass sections and...
Ok Thanks, so do you think it looks good so far?
Hi David, I finally got a serious start on my layout, I have some quesitons for you in regards to the overpass and placement of the station along...
Hello, I am finishing the interstate oil refinery by walthers and need some help as to how all the piping should be placed. Does anybody have a...
Thanks, My industry list is not as long now as I thought. 1. Sunrise Feed Mill 2. Walthers oil facility 3. A candy factory for my daughter 4....
In this plan, would it be possible in your opinion to straighten the curve on the left side a bit and add a spur in the bottom left corner? In...
David, I am struggling with which plan to go with as I have more industries that I would like to put on the layout. Can the yard lead that runs...
David, would you use a WS 2% incline set for this ?