SVPR SD 35 detailed Almost fully with BLMA details
Test running is important.
And the legs of the LED are shortened. The LED itself is sanded, too. It has got a flat head.
The ring has to be sanded.
The LED in its place.
The beacon light with its wires.
The wires for the head light and beacon light!
One screw got a new place.
Prepearing the weight.
Room for the speaker and box.
A look at the engine with lower weight. The old board is no longer used!
The weight got a lower place.
Prepearing the weight for its new place.
A look at the installed decoder.
some wires
A white LED is glued to the rear beamer.
Installing the ESU decoder
room for the speaker box
with old place for weight
Speaker is glued in place