Two horizontal pieces of 1x2 are screwed to the wall. The timber now holds the white vertical brackets to the wall studs. The level isn't just...
7 July 07 - Scenes from www. Used Photoshop to adjust lighting levels and do some blending. One photo is overlaid on others.
7 July 07 - had to blend section just to right of steamer and left of crane
7 July 07 - Working section that is raised about 1 inch from left side
4 July 2007 - It's been almost a month and I have been in a road block. Finally decided to rubber glue these scenes down. Small edge of Lost...
19 May 2007 - Amazing what a bit of paint on the backdrop adds and I'm no artist. First train running since paint applied.
Painting of sky and clouds on backdrop.
23 Nov 06 - Used 2x2's secured with two bolts through the back of the benchwork along the garage door to support the masonite. The masonite sits...
23 Nov 06 - Finally getting back into full steam re-construction. Here we have foam laid (bottom right) in the La Grange area and all through...
The river with a new trial backdrop
background trees behind highway
27 Dec 05 - The utility box didn't come out to bad IMHO. Better than I hoped. This is where Hearn junction will be and the beginning of the helix...