3mm hardboard stapled to framing. 85mm (approx) tall, this just hides the framing and the wires, and the workbench lighting. Looking down the...
Wiring for the staging deck's permanent framing completed. Including plugs which will go onto sectional modules when they're in place. Looking...
Wiring for the staging deck's permanent framing completed. Including plugs which will go onto sectional modules when they're in place. Looking at...
Shelving and Framing where wiring (and layout) will go; view from the room door.
Main deck lighting, 56W of fluorescent, despite there not being a main deck yet!
Put the Helix Baseplate into place. Supports and sub-roadbed and all the Vertical bits of the helix get screwed / glued to this. Looking out...
Framing for the backdrop, in the current (probably final) configuration. Main deck is at the right height now.
Framing for the backdrop, in the current (probably final) configuration. Main deck is at the right height now
Framing for helix, timber cut and mostly drilled. Have to countersink and screw together and fix it to a sheet of plywood. Power tools occupy the...
Two horizontal pieces of 1x2 are screwed to the wall. The timber now holds the white vertical brackets to the wall studs. The level isn't just...