A preliminary layout to see how I can fit my buildings onto the module.
I used 1/8 in. hardboard splines as a sub-roadbed. I used a spacer row to leave an easy way to route feeder wires. I notched out a slot in the end...
I used 1/8 in. hardboard splines as a sub-roadbed. I used a spacer row to leave an easy way to route feeder wires.
I installed 1/8 in. hardboard as a switchpad to the end of the module. I routed out holes for the SPDT contacts, and clearance for the ground...
with warehouse in background
with a little of preliminary scenery.
Added 1" pink foam, still have 1" to go, I'll be using spline roadbed next.
Second attempt at a module. I used 3/4" plywood for the sides and ends on this module. These legs slide on and off and are secured using wing...
Second attempt at a module. I used 3/4" plywood for the sides and ends on this module. I tried 1/4" plywood sides on the first module,...
Photos taken during the Friday 11/26 and Sunday 11/28 2010 at Beaverton Modular Railroad Club's setup at the Portland Christmas Bazaar