Main and siding on this module. The siding is 1/8" below the main.
I added the turnout after adding the straight track. I also use ribbon rail alignment gauges to keep track straight.
I layed all of the straight track on the main before laying in the turnout. this allows me to keo using the straicht edge. I also use ribbon rail...
I used a 48" drywall square to line up the track.
I painted the roadbed before laying track.
Both ends of the siding sanded to a ramp.
Sanded ramp with track for a test fit.
Sanded ramp.
I sanded the cork down at the ends of the sidings to create a ramp down.
Started laying 1/8" Model Power cork roadbed.
I bought a package of Model Power cork roadbed on clearance. Oddly enough it is only 1" wide as opposed to Midwest roadbed which is 1...
I used 2" screws with fender washers to hold the foam down to the frame while the glue was drying. I can easily fill the divets with wood...
I found theese brass handles at the Habitat for Humanity store in Seattle. They cost $2 for 4 handles. It definitely helps to have something to...
Like 9 just added a smll spur on the south module.
Wired for oNeTrak with green & red bus, accessory bus, and loconet. The wires meet in the middle at a barrier block.
Close up of diagonal bracing and pocket and catch for legs.