Note, the concrete pier that supports the center of the wooden trestle came with the steel arch bridge kit.
The steel arch bridge is in need of some proper footing. Will construct them during the course of the week.
Got a little further with the Rio Cobre Dam. I have decided to let the bridge rest on concrete supports built into the front of the dam. It's...
Had to pause work on my module to snap a shot of two Atlas SD50s crossing the steel arch bridge.
West Seattle. 12-19-2009
Nucor YD15 sets out a cut of loaded scrap gondolas for delivery to its West Seattle mill. 11/14/2009
Takes the empty gondolas we just left, while we leave with the loads they just left us. West Seattle 11/14/2009
Waits for us to push a cut of loaded scrap metal gondolas out of the 105 siding. We are pulling empties on the front end. 11/14/2009
Pulls ties on to a cut of scrap metal gondolas we just brought in. 11/14/2009
Progress photos on my N Scale Steel Mill Layout
Nucor Steel Mill West Seattle