Initial configuration of main yard is temporarily tacked down in order to provide the opportunity to allow mock operations for evaluation and...
I had opted to use code 100 track on this layout because I has so many Peco code 100 insulfrog turnouts left over from a previous layout and I had...
Most of back drop and cab plug ins, etc installed! Wheather has been good, so other projects have taked priority!
Just applied 3rd coat of paint.
Trestle complete with barrels
Photo from end of modules
Overall photo of reifnery area prior to piping
Loading Rack just before final glue down
Plaster work in the CJ yard and Spardra area
Here is my attempt at constructing a three in one N scale shelf. This shelf will act as a brake in track, a display shelf and a eye candy diorama,...