It is high time I posted some more information on the progress on my Slovenian layout. [FONT=verdana, arial]The basic loader structure is complete, and detailing has begun with the side shutes for loading into road trucks. The support rods for the shutes to be added plus ladders, walkways, etc.[/FONT] [FONT=verdana, arial][FONT=verdana, arial]Two hopper wagons have been obtained, these need modifying and repainting, a road vehicle also acquired. More will be purchased as they are found.[/FONT][/FONT]
[FONT=verdana, arial][FONT=verdana, arial]A roadway has been laid to give access for trucks, this crosses the tracks and disappears behind the trees. [/FONT][/FONT][FONT=verdana, arial][FONT=verdana, arial]The walkway and ladder has been made in brass and fitted between two legs.[/FONT][/FONT]