Building the KATO Unitrack Black River Junction Layout

SimRacin14 Jan 17, 2017

  1. SimRacin14

    SimRacin14 TrainBoard Member

    482
    229
    22
    The inner loop has the same issues with these engines.

    I don't know if radius is an issue. Again, my MTH GEVO, which is just as long and has as many axles will run laps and pull 15-20 car trains around the oval with no problems at all.
     
  2. SimRacin14

    SimRacin14 TrainBoard Member

    482
    229
    22
    Minimum radius for any of the GEVOs is 18 inches. Minimum radius after checking information on the trackplan is 19 1/2. 19 for sure at least. Found some tiny silver metal pieces on the track which I think is from underneath one of the IM GEVOs (I have them sitting on the foamboard on the layout) as I found some more pieces after moving them. It's kinda frustrating really, I don't spend a whole lot of time out there to begin with, yet everything seems to be falling apart. I might run trains around the oval for a few minutes at a time if I can and that's it.
     
  3. dalebaker

    dalebaker TrainBoard Member

    1,608
    1,885
    45
    The first thing I do with a new loco is clean wheels. You'd be surprised at the gunk you get off them.

    I use the 90% alcohol and paper towel method. It does wonders. Don't give up yet!
     

Share This Page