Granite Gorge & Northern in Z scale

Gen Jul 2, 2023

  1. Kurt Moose

    Kurt Moose TrainBoard Member

    9,860
    14,346
    147
    Jeez, your almost building this the way a 1:1 scale railroad is built!!o_O

    This is getting cool!(y)
     
    Gen and CNE1899 like this.
  2. Gen

    Gen TrainBoard Member

    44
    82
    18
    Now if someone would just pay me :LOL:

    I've been brainstorming on how to approach the guard rails given the pieces will be so tiny, and I think I might continue to just make jigs to build the 5 inner components separately, and then solder or maybe even crazy glue them in place (if tack soldering makes them fall apart). We'll see.
     
    Last edited: Aug 5, 2023
    CNE1899 and Kurt Moose like this.
  3. Gen

    Gen TrainBoard Member

    44
    82
    18
    I made some progress over the past two days, lots of photos taken, link here for the entire album of this 42° crossing.

    Some notes so far:
    • Creating a simple jig was definitely worth it for time and accuracy. I will just use more glue next time.
    • The guardrail center piece (stock rail) was so small I had to glue those to the mat before soldering.
    • It was necessary to make some extra acute angled pieces. Whether I was too rough in filing, bad eyesight, failed to secure my jigs or rails while soldering, or failed to correctly cut/file/dremel various components for length, I needed to make 3-4 more of those to cover mistakes and mishaps.
    • One technique which I sort of stumbled upon that really worked great: tack the angled rail with solder and then place the angle on a 1-2-3 block, with additional 1-2-3 blocks weighing everything down except the joint, then baste it with flux again and give it another go with the soldering iron. This kept the angle from shifting while allowing the solder to soften and press the railheads even, resulting in better quality point and much less sanding. It was worth the extra time IMO.

    Here are some photos from this weekend:

    20230805_123013.jpg

    20230805_124104.jpg

    20230805_124105.jpg

    20230806_013546.jpg

    20230806_151000.jpg

    20230806_172214.jpg
     
    Last edited: Aug 7, 2023
    JoeTodd, Kez, HoboTim and 4 others like this.
  4. CNE1899

    CNE1899 TrainBoard Member

    1,118
    1,899
    36
    Gen,
    Very, very, very nice!(y)(y)(y):D:cool:
    Thanks for showing us your process.
    It seems at this scale, making parts over again is inevitable.

    Scott
     
    Gen likes this.
  5. Kurt Moose

    Kurt Moose TrainBoard Member

    9,860
    14,346
    147
    That's a piece of art!

    Heck, you could hang that on the wall!

    Looking forward to more updates, holy moly!(y)
     
    CNE1899 and Gen like this.
  6. Gen

    Gen TrainBoard Member

    44
    82
    18
    Well this little crossing is complete and I'm pleased with the final result:

    42° crossing.gif


    Some notes

    • I'm really happy that I took this challenge. I agonized over designing and utilizing this particular piece of trackwork due to the work involved, but I'm glad I stuck with it. It will really add some visual and operating interest to the layout.
    • There were, again, some pieces that needed resoldering/repair due to minor mishaps, but overall I think prefabbing was the way to go.
    • Flush filing the diamond evenly with the guardrail components was still necessary despite what I believe was a foolproof approach (I yelled this with dissatisfaction into the abyss, no one heard me)
    • When the crossing was lifted I addressed two areas of transition where I felt a bump from running the truck wheels across. Pressing the rail with the iron into a 1-2-3 block from the backside brings everything flush (leaning into the tie also).
    • I had to micro drill an access hole to cut the gaps! (second to last photo). Luckily I had 8-0 jeweler blades.
    • Testing for shorts was a bit cumbersome but both frogs are now isolated. I ended up doing more tie filing than really necessary because the rail gaps were so narrow and they hid a metal shaving.

    Full photo album of this crossing is available here. When I have time I'll try to caption each photo.

    Highlights:

    20230807_210601.jpg

    20230807_233848.jpg

    20230808_015531.jpg

    20230808_020400.jpg

    20230808_214236.jpg

    20230809_011453.jpg

    20230809_141607.jpg
     
    tjdreams, HoboTim, Kurt Moose and 5 others like this.
  7. CNE1899

    CNE1899 TrainBoard Member

    1,118
    1,899
    36
    Gen,
    Wowie! That's some fine trackmanship!(y)(y)(y)

    Scott
     
    Gen likes this.
  8. Gen

    Gen TrainBoard Member

    44
    82
    18
    Thanks Scott, I appreciate the positive feedback!
     
  9. Kurt Moose

    Kurt Moose TrainBoard Member

    9,860
    14,346
    147
    That's art right there, beautiful!:love:
     
    CNE1899 and Gen like this.
  10. Gen

    Gen TrainBoard Member

    44
    82
    18
    Thanks Kurt! (y)
     
    Kurt Moose likes this.
  11. rray

    rray Staff Member

    8,312
    9,463
    133
    That is some really excellent track construction, the soldering is impeccable. [​IMG][​IMG][​IMG][​IMG][​IMG]
     
    Kurt Moose, CNE1899 and Gen like this.
  12. Gen

    Gen TrainBoard Member

    44
    82
    18
    Thank you, that's a much appreciated compliment!

    I believe 100% in your signature mantra. It's important to document and share dilemmas, failures, as well as successes along the way to a satisfying end result.
     
    rray likes this.

Share This Page