Prototpye Trackplanning

cely Jul 8, 2011

  1. cely

    cely Permanently dispatched

    35
    0
    7
    I exported an image of the 69th Street Terminal in Upper Darby, PA to a file. I then imported the image into AnyRail, scaled the image until the track-to-track spacing was 25mm (the natural spacing for Z scale) and laid Rokuhan track on top of the image. It took me about 4 hours.

    The relationship of the track to the buildings, to the roads, to the cars, to the buses is what I like the best. Wish I had the space, time and money.

    I added a drawing from SEPTA that explains the trains, tracks and bus routes better than I can. 1000 words.
     

    Attached Files:

    Last edited by a moderator: Jul 14, 2011

Share This Page