Well fially finished canyon side of back drop only to relize i need to touch up a few areas ididn't bring far enough down, no problem as i am going to start the hawk junction side, also in the workings are the 2 waterfalls made from dap03 clear caulk and i have decided to pour the agawa river using envirotec.any comments or suggestions on the back drop are as usual most welcome. regards&later KEWATIN