I'm happy with mine. very attempted to get the Maersk one to go with the NS SD40-2 http://youtu.be/SpWE8Mwlcko
worked on the layout, Main 2 across the bridge http://www.flickr.com/photos/37922909@N06/8146030930/in/photostream main 1 progressing...
Ended up working both days but did get some work done on my layout. mainly getting fiddle yard tracks down. Video here...
another aussie..... coming out of the woodwork. welcome aboard
My Life Like F40 is going to become a cabbage when I get around to it
haven't posted here for quite a few yrs now. still shoot trains everynow and then, here is a link to my Flickr site Flickr: Sten Parker's...
In Sydney Australia, all Cityrail trains have the driver up the front and the Guard (that's Conductor in American speak) in the middle. the...
life in the new millenium sux hey, over here in Sydney Aust, the Roads and Traffic Authority banned mobile phone use while driving a motor vehicle...
all I can say is where are the catchpoints, then all that would of happened was the derailment of the Metrolink service through the catchpoints...
Different states have different guages. Queensland is 3'6" but the sugar cane system is 2' NSW is 4'8.5" as now is the National Network with...
It has been said many a time in this thread.... but .... WE NEED DASH 8-40C / CW's !!!!!!!!!! c'mon Atlas and Kato, flip a coin also...
Risk assessments and NAR can be dangerous for those people Gary, I hope the outcome of this doesn't involve Network Control babysitting...
at present moment (ie right now) I'm at Sutherland, but I have been at Clyde, parra Rd and Balmain Rd. Balmain is due to close on the 1st of...
our requirements for passenger car strength are not as stringent as that of the FRA. The N class cars involved in the derailment are basically a...
Gary, I looked at this and thought what?? again?? then looked at the date
Colonel is working at putting me out of work........... what do I do, I'm a signaller on the above mentioned railnetwork (Railcorp - Sydney...
Man I would love to see that. just because it is something other than a long coal train. In Australia Pacific nation recently began running a...
Our entire electric fleet is double deck and has been since the early 1990's. They did look at the possibility of single deckers in a new...
The design was actually used first in the late 1960's by Commonwealth Engineering in NSW Aust for our V set Intercity EMU's. Unfortunatley the...
my wish list 2+2's with containers UPS equipment JB Hunt equipment truck trailer wheels (no probs scratchbuilding the trailer, but my...