Rails to the closet. Due akward angles in this area, my early attempts to align the benchwork to the wall failed. I'm now installing benchwork and...
A tricky cut for the subroadbed into the closet. I aborted this peice of luber due to dimensional mismatches.
Bolted valance frames sitting on the deck.
Last section of south deck installed. Oops I cut it 1" too short.
East and South valance frames drilled for attaching togehter.
East and South valance frames clamped for drilling.
East valance frame skin added.
East valance frame.
South valance frame in progress.