2012 - Model Railroading Goals?

DragonFyreGT Jan 1, 2012

  1. DragonFyreGT

    DragonFyreGT TrainBoard Member

    991
    60
    22
    So what are your goals for model railroading in 2012? In all honesty, I'm just hoping to get the main part of my benchwork built, an engine yard with the Walthers Stalls, Shops, details and transfer table. Oh and a new baby :)
     
  2. Seachicken

    Seachicken TrainBoard Member

    10
    0
    10
    I just hope to get the base of my layout finally started. After that it would be nice to get soe track layed.
     
  3. bremner

    bremner Staff Member

    6,298
    6,417
    106
    start my layout, I currently have 5 detailed SP locos and can use about twice that. I need a ton of freight cars and 2-4 more cabeese. I have enough track to start my layout...
     
  4. MisterBeasley

    MisterBeasley TrainBoard Supporter

    1,089
    20
    30
    About 2 years ago, I had nothing but raw benchwork on Phase 2 of my layout.

    [​IMG]

    Now, I'm down to the 2 corners of this section. This area will be the Empire Leather Tanning Company complex:

    [​IMG]

    And this is the beginning of Mooseport on the other end. Mooseport will be a carfloat terminal:

    [​IMG]

    Really "finishing" all of this is probably an ambitious goal, but I'm making good progress on Mooseport right now. Most of the effort will be in structure-building and detailing, but I've got a lot of rolling stock kits in the basement, too....

    Maybe one of my goals should be to take inventory of my kits and make a guess of how long it will take to build them all.
     
  5. GP30

    GP30 TrainBoard Member

    3,531
    2,346
    81
    I hope to have all track laid and the train elevator installed by the end of 2012.
     
  6. Mark Dance

    Mark Dance TrainBoard Supporter

    195
    625
    19
    thx for the prompting question...I've put a fair amount of thought into this in terms of an interim milestone towards where I'd like to be for Vanrail 2013 in Sept 2013.

    Work and family permitting...I'd like to:

    1) get bridge scenes and scenery complete - or at least progressed significantly - at 3 locations on the layout: Lemon Creek in the Slocan Valley, Troup Junction east of Nelson and the Kootenay River crossing west of Nelson.

    2) finish the full complements of dispatcher-controlled train order semaphores(wiring and control are already in).

    3) build the two snowsheds. I have material on order for a board by board construction but have recently considered having all the "bents" laser cut to speed things up.

    and If I get bored...

    4) try my hand a rolling stock weathering and make some progress on weathering the fleet.

    a full year...if I get through 1/2 of it I will be happy (though behind)!

    Happy New Year everyone

    md
     
  7. DragonFyreGT

    DragonFyreGT TrainBoard Member

    991
    60
    22
    I'd love to see photos of your snow shed builds (if you do do it), being that I am trying to model Marias pass and will need some myself.
     
  8. Virginian Railway

    Virginian Railway TrainBoard Member

    780
    44
    19
    Get started on my Virginian-based layout.
     
  9. Railroad Bill

    Railroad Bill TrainBoard Member

    327
    0
    11
    Have a 2x8 fresh layout with a provisional track plan laid and being wired. Hope to have test runs next week. Then will emplace a two track passenger station for fun running and begin detailing the station, as it can be easily removed and re-emplaced. Sometime or other I'll treat the surfaces for texture and color, emplace a small forest for sightline controls, etc.

    All such done, I'll add a 2x4 ell to the 2x8 (making a 10x4 L?) and work its scenery out to match.

    All this seems quite possible in the next 3 mos. :pcool:

    But, what follows I can't imagine. :pbaffled:
     
  10. Candy_Streeter

    Candy_Streeter TrainBoard Member

    2,582
    6,039
    71
    I have two structure kits I got for Christmas I hope to build and post here. I might need help. Other than that I never make plans.
     
  11. subwayaz

    subwayaz TrainBoard Member

    3,222
    106
    44
    I want to get my N Scale layout wiring done for the DCC Lenz and start on my HO NYC layout
     
  12. Tracy McKibben

    Tracy McKibben TrainBoard Member

    1,181
    98
    24
  13. friscobob

    friscobob Staff Member

    10,534
    712
    129
    • Benchwork in place, including removable staging-yard benchwork
    • Track down
    • Trains running
    • Most industries (or mockups of same) in place
    • Resume metal-wheelset installation on rolling stock
    • Have DCC installed by year's end 2012
    • Just have FUN!
     
  14. Shortround

    Shortround Permanently dispatched

    4,410
    5,283
    93
    Most importantly find a larger apartment. Where I can do a layout without getting in the way. I plan on doing early diesels in Wisconsin. Which in it self may be a challenge to find engines.
    I also want one steam engine - a 2-6-0 of specific design. I want part of the layout to be modeled after the Petticoat Junction TV show. If I can find a good engine I may start on a diorama of that while still here.
     
  15. HOexplorer

    HOexplorer TrainBoard Supporter

    2,267
    3,220
    70
    Put the finishing touches on my layout and try to keep it around through 2012. Jim:tb-biggrin:
     
  16. bremner

    bremner Staff Member

    6,298
    6,417
    106
    the prototype was the Sierra...
     
  17. verse2damax

    verse2damax TrainBoard Supporter

    1,079
    23
    27
    WOW!!! Some pretty compelling projects I see. Well here is mine.

    [​IMG]

    Here's a photo of what's on top of my list for 2012. The order is as follows:

    A. Six (6) BNSF C44-9Ws, three of which will be upgraded to the late style Dash 9s used by BNSF. They will be super detailed and sound will be added. The decoder of choice Tsunami. Happy to say this project is now in full swing!

    B. Four (4) GP60Ms, two of which will be fitted on P2K GP60 drives. They will be super detailed for now, sound will come later. (2) GP60B units. The one pictured above will be fitted on a P2K GP60 drive. The other only needs super detailing. It already has a silent decoder installed.

    C. Three (3) SD40-2s. Both units in the BNSF paint are Athearn shells on modified Kato drives, the other, in the SF livery, is full Kato. All will be super detailed to match a specific prototype. The unit in the front row and second to last, at right, will be an ex CN unit. I have already installed the awning, just behind the cab and over the walkway, on both sides and painted them. Ditch lights are next. Sound decoders will be added however that might be next years project.

    D. Santa Fe SD45 (Pictured between the SF GP60B and the SF Sd40-2 units). That unit is just the shell and chassis at the moment. I currently in need of the entire drive system (Any donors???). Then will come the super detailing and weathering.

    C. Six (6) SD75M/I units & Two SD70macs. They all have sound decoders so I have the super detailing and weathering left to do on these unit.

    Will have do some sales of other units from my collection to fund the sound upgrades. Yes I am an hoarder...I mean avid collector as well as a dedicated Model railroader. Anyway, have to get rid of some of the shelf pieces to facilitate improvements in other areas. :)
     
  18. Candy_Streeter

    Candy_Streeter TrainBoard Member

    2,582
    6,039
    71
    Don't forget the girls
    [​IMG]
     
  19. DragonFyreGT

    DragonFyreGT TrainBoard Member

    991
    60
    22
    Nothing personal, Candy, but if I have a daughter, I'm keeping her far, far, away from you :p j/k
     
  20. Shortround

    Shortround Permanently dispatched

    4,410
    5,283
    93
    Thanks a lot. Now to find one in HO. And three lovely ladies for the water tower.
     

Share This Page