ATSF Line Started

OC Engineer JD Apr 10, 2007

  1. OC Engineer JD

    OC Engineer JD Staff Member TrainBoard Supporter

    12,782
    1,117
    152
    I will work on adding the track tomorrow too, and have to add a new section of benchwork so the track can reach the other side with the new loops. So as of now I cannot operate. :(
    [​IMG]
     
  2. OC Engineer JD

    OC Engineer JD Staff Member TrainBoard Supporter

    12,782
    1,117
    152
    Thanks David! :)
     
  3. OC Engineer JD

    OC Engineer JD Staff Member TrainBoard Supporter

    12,782
    1,117
    152
    This is a problem I am going to have to deal with in a few areas. The original trackwork was in the middle of a narrow base. I have to squeeze the other line in somehow. In this photo you can see the original cork in the middle, and two new pieces added to the outside of each side. The two new lines will be sitting halfway on the original base, and halfway on a new piece of cork. It will be tight, but it will work, and running two seperate trains will be worth it. Once I add anymore of the ATSF benchwork this will not be possible so I have to do it now. (I also think this is the reason I have been so slow to advance the ATSF Line. I have always wanted to double track the SP.)
    [​IMG]
     
  4. OC Engineer JD

    OC Engineer JD Staff Member TrainBoard Supporter

    12,782
    1,117
    152
    Other little things I did was give the 'ocean' a good cleaning.....and what a difference it made! Also added a little more static grass here and there. Thats about it for now till tomorrows progress. :)
     
  5. jagged ben

    jagged ben TrainBoard Member

    1,832
    4
    31
    The Pinole scene is really good modeling. Nice to see more pictures of your progress.
     
  6. OC Engineer JD

    OC Engineer JD Staff Member TrainBoard Supporter

    12,782
    1,117
    152
    Thanks Ben! Good to be able to get back in there and do something. :)
     
  7. fifer

    fifer TrainBoard Supporter Advertiser

    3,016
    316
    53
    Good to see you get in there and give those pesky rodents the what for!!!!!!!!

    Looks Good Jerry !!!!

    Mike

    PS can you help me get my avatar back ?????
     
  8. Tad

    Tad TrainBoard Supporter

    1,270
    662
    37
    It's cool to see you having the opportunity to get working on your pike again, Jerry. I am looking forward to seeing your progress.
     
  9. OC Engineer JD

    OC Engineer JD Staff Member TrainBoard Supporter

    12,782
    1,117
    152
    Thanks Mike and Tad! :)
     
  10. OC Engineer JD

    OC Engineer JD Staff Member TrainBoard Supporter

    12,782
    1,117
    152
    I did just finish the first layer of ground and gravel in the tank yard. (Just couldnt wait till morning.:))
     
  11. SecretWeapon

    SecretWeapon Passed away January 23, 2024 In Memoriam

    5,121
    3,788
    103
    Looking Great!!!!!!!!!!!
     
  12. RBrodzinsky

    RBrodzinsky November 18, 2022 Staff Member TrainBoard Supporter In Memoriam

    5,685
    2,787
    98
    Jerry - nice to see the progress shots, again! So, all Pinole needs now is a flare from a cracking tower, or a brown smoke plume:pbiggrin:
     
  13. mcjaco

    mcjaco TrainBoard Member

    1,163
    77
    28
    Jerry, I'm a bit confused....perhaps it's been too long since I've seen the track plan for this part.

    Was it a single track that looped back around to head back the other direction to make it look like it was double track on the scenic portion?

    How are you changing it?
     
  14. OC Engineer JD

    OC Engineer JD Staff Member TrainBoard Supporter

    12,782
    1,117
    152
    You know it Rick!!! :)
     
  15. OC Engineer JD

    OC Engineer JD Staff Member TrainBoard Supporter

    12,782
    1,117
    152
    Matt, yes, thats how it was......one loop that looked like a double track on the sceniced portion. A train would go by in one direction, and come back on the other track. I am making it where each line will be it's own loop, so I can run two trains, one on each line on the sceniced area. One freight, one passenger. One freight in each direction. Two freights in the same direction at different speeds....etc. :) Much more possibilities then I have now.
     
  16. OC Engineer JD

    OC Engineer JD Staff Member TrainBoard Supporter

    12,782
    1,117
    152
    Thanks Mike! :)
     
  17. OC Engineer JD

    OC Engineer JD Staff Member TrainBoard Supporter

    12,782
    1,117
    152
    Today I got most of the tank area glued down. Still aways to go, but I like the way it is coming along! Will get some photos posted later today or tonight. :)
     
  18. mcjaco

    mcjaco TrainBoard Member

    1,163
    77
    28
    Thanks Jerry. That will definitely open up more possibilities!
     
  19. UPCLARK

    UPCLARK TrainBoard Member

    507
    3
    16
    I feel you're pain about not being able to operate! I get the hebe-jee-bees when I start teearing up track on an expansion or maintenance. I'm looking at an expansion that will take my flipped over dogbone and turn it into a true dual mainline. I don't really want to loose the overall single track run time around the layout but it sure makes east and westbound trains easier.

    IIRC, you're running with DC control so the dual mains is almost a must.

    You know, if you really need to get some trains running, you could invest in some Unitrack and throw down a temporary track for the short term to get up and running again!
     
  20. OC Engineer JD

    OC Engineer JD Staff Member TrainBoard Supporter

    12,782
    1,117
    152
    That would be a great idea Clark, but I have a 3-4ft benchwork gap I need to close first! LOL
     

Share This Page