Double checking the track with an NMRA Gauge
Fine tuning the curves with an alignment gauge
Forming flex track for the helix using a template
Testing the formed track with a locomotive and cars
The sub-roadbed assembly was designed so that it would be 1/4 inch thick with the roadbed installed.
Progress on the helix showing installation of Woodland Scenics foam roadbed on the first turn.
Preparing to form the Peco Code 55 flex track to a radius of 16 inches for the helix using an acrylic template. The Ribbon Rail gauge will be...
First multiple unit consist - RS-18 607 and RS-10 581
First train movement with CVP T9000 wireless throttle
First train movements using DCC.
Upper level benchwork for Tremblay siding painted and installed. These sections are situated above the Pine River sections and will adjoin the...
Curtains installed below benchwork on west wall.
Curtains installed below benchwork on east wall.
N Scale model of National Metal scrap trailer prior to painting
N Scale model of Labatt's refrigerator trailer prior to painting
N Scale model of Labatt's refrigerated trailer prior to painting
Completion of sub-roadbed assembly for all six and a half turns of the helix
Progress on master for Stewart 45 foot flatbed trailer body in N Scale